01 / 11
DOKAJ RESIDENTIAL BUILDING
Slide 0
DIJAM Garden Residential Building

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

Dijam Garden Residential Building

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DIJAM Garden Residential Building

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

DOKAJ RESIDENTIAL BUILDING

date:
2024

status:
under construction
-------------------------
Principal Architect:

Alireza Sherafati - Pantea Eslami
Client:
Emarat Engineering Group (Majid Mogherri)
Lead Designer:
Parsa Ardam
Project Manager:
Zahra Asna ashari

Design Team:
Maryam Karimzadegan – Malihe Gholizadeh –Sajed Kheyrollahi– Saba Baraty– Anahita Dakhili –Soheil Asghari – Nilufar Mohammadzade – Pedram Rayanpour

Electrical Installations Consultant:
Eng. Aydin Afshar
Mechanical Installations Consultant:
Eng. Iman Lotfollahi
Motion & Graphic Design:
Parinaz Torkian
Exterior Rendering:
Marzieh Estedadi
Interior Rendering:
Maryam Karimzadegan - Zahra Asna Ashari 

Slide 0
Menu
Close
Close
Categories
Project info

Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings. It doesn’t have a view to the street and it is not seen by passersby. It is a project with no prominent façade, and therefore insignificant for most architects.Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings.
Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings. It doesn’t have a view to the street and it is not seen by passersby. It is a project with no prominent façade, and therefore insignificant for most architects.Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings.
Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings. It doesn’t have a view to the street and it is not seen by passersby. It is a project with no prominent façade, and therefore insignificant for most architects.Over the last 2 decades architecture in Tehran has experienced absurd transformations. Lack of profitability of industries on one hand and imposed sanctions on the other hand have exacerbated an already soaring real-estate market in the capital.
Having identified their properties as a promising investment zones, land owners with lots as small as 200 sq.m (the city’s smallest size parcels) have demolished their single family houses and developed them into four and five storey middle class apartments. As a result, the city is now faced with agrowing number of infill projects whose aesthetic challenges are generally reduced to envelope design.
In this particular project, the site is located at the end of a dead-end alley and is surrounded by other buildings.

You are currently using an older browser that can only display a basic version of this website.
Please upgrade or use an alternate browser to see the full version.